1. The drawings to issue
Choose the folder with the PDFs you are about to send.
0PDF files
2. Your drawing list (optional)
An Excel register or document list. It lets the check find missing drawings and wrong revisions.
✍Drag a box around the drawing number in the title block, then a second box around the revision. A third box for the title is optional.
Areas
No areas yet. Drag on the drawing to add one.
| File | Drawing No. (title block) | Rev. | Rev. in list | Problems |
|---|
| Drawing No. | Rev. in list |
|---|